Schedule

Fixed Guideway – The Santa Ana-Garden Grove Fixed Guideway study is funded by the Orange County Transportation Authority’s (OCTA’s) Go Local Program, which seeks to improve connectivity to the regional Metrolink commuter rail system. Construction is anticipated to be funded through a combination of local, state and federal funding sources, including Renewed Measure M -- Orange County's local half-cent sales tax for transportation projects.

The project team has prepared environmental studies and conceptual engineering plans to identify the benefits and impacts of various technologies (modes of transportation) and alignments (routes.) The draft environmental document is required to meet federal (NEPA) and state (CEQA) requirements and is available for review at the following link. A Locally Preferred Alternative will be selected shortly thereafter, clearing the way for detailed engineering to get underway.

Fixed Guideway Timeline

Home | The Fixed Guideway Project | SARTC Master Plan | Route Options | Schedule | FAQs | Meetings | EIR | Contact Us | Email | Privacy
contact_form.html FAQs.html Schedule streetcar_route_options.html Meetings/Hearings http://www.santa-ana.org/ index.html eir.html streetcar_route_options.html FAQS.html Schedule contact_form.html Meetings/Hearings http://www.santa-ana.org/ http://www.santa-ana.org/ contact_form.html